PAGE IS UNDER CONTRUCTION
Cutting Edge Technology
Sen Tat utilizes modern technology to render quality products
Customizable Solutions
We know each industry is different. So, we design products that fit every steel structural building.
On-going Projects
Name of Project | Scope of Work | Approx, Wt (Ton) |
---|---|---|
Proposed New Erection of Single-user Industrial Development Comprising A block of 4- Storey Manufacturing Building at Tampines Industrial Avenue (VSMC FAB Building) | Fabrication and Installation of Structural Steel works at FAB Building | 1200 tons |
Proposed Additions and Alterations involving the construction of Shelter for Play court and Ancillary works at Selected Schools (MOE Projects) | Fabrication and Installation of Structural Steel works for Roof Shelter and Link WAy | 600 tons |
Contract T232 RTYS Link (LTA Project) | Fabrication and Installation of Structural Steel works | 800 tons |
Tuas Terminal F2 at Tuas South Boulevard T201-T202, T216, T1218 (PSA | Fabrication and Installation of Structural Steel worksand Metal work | 1300 tons |
contract T301, contruction of 4-in1 Railand Bus Depot and REception Tunnels for Thomson-East Cost Line | Fabrication and Installation of Structural Steel works, metal work and gravity louvers with electric facility | 1500 tons |
contract J106, design and contruction of Boon Lay station and Viaduct Including addition of alternation to the existing east west line (EWL) Boon Lay Station for Jurong Regional line | Fabrication and Installation of Structural Steel works for JS8 statin roof, Entrace, POB and Link Bridge | 850 tons |
contract J110, design and contruction of Jurong East Station and viaduct Including Additonal and alternation work to the existing Jurong East station for Jurong Region Line | Fabrication and Installation of Structural Steel works and ERSS | 1300 tons |
Accomplished Projects
SSW FABNEXT – Siltronics
This SGD 30 million project boasts a notable 1,000m-long bridge
surrounding the factory, constructed using modular hoist
technology and prefabricated components.


SSW FABNEXT – Siltronics
I axxxxxxxxxxxxxxxxxxxxxxxxxxxxx
Early on
xxxxxxxxxxxxxxxxxxxxxxxxx
PAGE IS UNDER CONTRUCTION