Projects
Semi Conductor Projects
SSW FABNEXT SILTRONICS
This SGD 30 million project boasts a notable 1,000m-long bridge surrounding the factory, constructed using modular hoist technology and prefabricated components.



GLOBAL FOUNDRIES
This SGD 35 million project features an impressive array of structural components, including: – A 76m long-span roof truss, Cooling tower structures, Chiller plant structures , Pipe racks, Link bridges Notably, the 300T chiller plant structure was successfully hoisted as a modular unit, complete with integrated M&E services.”
Semi Conductor Projects



UMC-FAB BUILDING
MC- FAB BUILDING project showcases our expertise in large-scale steel construction, featuring: – 10,000 tons of steel – A remarkable 100m long-span truss and Various other complex steel structures The assembly and hoisting of these massive, long-span trusses demanded a high degree of specialization and precision, highlighting our team’s exceptional capabilities and expertise.”
Semi Conductor Projects
MICRON - AMHS EAST & WEST BRIDGE
Project involved the construction of two heavy-duty, high-rise bridges – East and West – each spanning 300m in length. The most significant challenge was installing these massive bridges within a live plant, necessitating stringent safety measures. To ensure the utmost protection of people and property, we implemented a rigorous 200% safety protocol, guaranteeing a secure and successful project execution.
Semi Conductor Projects



Semi Conductor Projects
MICRON FAB 10A- PIPE RACKS
We successfully delivered another high-profile Clean Room project. This complex undertaking featured:
- A massive pipe rack with heavy-duty beams and unistruts (6500 TON & 120000 R/M Unistruts)
- Stringent finishing requirements to ensure a high level of cleanliness and hygiene
- Precision engineering to maintain the integrity of the clean room environment
NOTABLE PROJECTS
PORT DEVELOPMENT PROJECTS
- Project Name: Tuas Terminal Reclamation, Wharf Construction, and Dredging Phase
- Client: Penta Ocean/Hyundai/Boskalis Joint Venture
- Tonnage: 800T
This large-scale project involves the reclamation, wharf construction, and dredging works for Tuas Terminal Phase 2. Our company supplied 800 tons of steel for this massive undertaking.
MOH PROJECT (STAINLESS STEEL METAL WORKS)
- Project Name: Woodland Health Campus
- Client: SDK Consortium
- Tonnage: 600T Stainless Steel
- Location: Woodland Drive 17
This notable project for the Ministry of Health (MOH) features extensive stainless steel metal works, showcasing our expertise in delivering high-quality, large-scale metal fabrication solutions.




LTA PROJECTS
LTA -J106 STATION
The installation process, carried out in a highly visible public location, required meticulous planning and execution to minimize disruptions to the surrounding area.
T301 PROJECT
Installation of smoke barriers to ensure fire safety and compartmentalization - Installation of louvres for ventilation and airflow management - Fabrication and installation of steel supports to facilitate the smoke barrier and louvre systems
LTA PROJECTS
We're honored to have contributed to various government projects, including several Land Transport Authority (LTA) initiatives over the past decade. Our expertise has helped shape Singapore's infrastructure, and we're proud of our involvement
LTA PROJECTS
We're honored to have contributed to various government projects, including several Land Transport Authority (LTA) initiatives over the past decade. Our expertise has helped shape Singapore's infrastructure, and we're proud of our involvement
MARINE INFRASTRUCTURE DEVELOPMENT
MARINE INFRASTRUCTURE DEVELOPMENT
The project involves addition and alteration (A&A) works to the existing Marine deck at Marina South Pier, with the aim of extending berths CM01 and CM02 for the Marina Cruise Centre. TOA Corporation is the client for this undertaking. The scope of work: – Supply, fabrication, and installation of steel bridges – Fabrication and installation of metal works
TOA Corporation
The project involves the proposed erection of a breakwater offshore of Tanah Merah Ferry Terminal. TOA Corporation is the client for this undertaking, located at State offshore MK31. The scope of work: – Fabrication and installation of Pile clamps, structural steel and Stainless steel railings
MARINE INFRASTRUCTURE DEVELOPMENT
POC-TOA Corporation-Macdpw
The project involves the construction of a proposed marine structure, current training wall, and other ancillary works for the International Cruise Terminal at Marina South. The project is being undertaken by a joint venture between POC-TOA Corporation-Macdpw.